We have completed the design and Construction fo this project; SMART TRAFFIC CONTROL SYSTEM, integrated with PEDESTRIAN ZEBRA CROSSING ACTIVATION!
The Project Title sounds too much, and as such, the follow up Design that enables the complete construction was also to much. The Design alone, couldn't stay within the work area for protues software, as I had to design each block on a different frame







0 comments:
Post a Comment